To the central content area

98 year Chiayi air quality improvement maintenance plan the time interval air pollution impeachment case processes the plan at night

Absrtact
The plan execution to December 31, 2009, total accepts and the assistance impeachment case examines altogether 986, as well as completes the reporting reexamination, general and key and so on checks does an inspection idea 636, total 1,622, achieve 162.2%th plan target, carries out the achievement abstract explanation to be as follows: First, the impeachment case accepts with the examination achievements Plan execution period altogether accepts impeachment case 986, included the air pollution (unusual smell) 271, open burning 151, to build project 33, noise case 477, environmental sanitation 43. And by the noise case number primarily, accounts for 48.4%th total case number, next (unusual smell) accounts for 27.5% for the air pollution. Counts above accepts the impeachment case to spend the time average to scene is 18.0 minutes; On-duty period accepts in 465 impeachment cases, some 64 accept the time shade to overlap, if the rejection does not include the statistics to accept the impeachment case to report the scene equally to spend the time reduction is 15.0 minutes. In 2009 total accepts 986 impeachment cases, 72.1% offense reporters expressed that cannot reply, but has not left behind the contact way. Another 28.0% offense reporters leave leeway the talk-back, completes replies and completes the degree of satisfaction investigation to count 241, the offense reporter expressed that the degree of satisfaction reaches 90.0%, the demonstration most offense reporters to result of expression affirmation this plan processing case. Second, all previous years suffer the impeachment case analysis and the tracing improvement situation repeatedly 2004 year to 2009 year accumulations suffered the populace to report 3 times by, and continued in 98 years to have case of total 22 reporting, in near 3 years suffered the offense reporter idea to have 3 repeatedly. Screens 98 year accumulation reporting to surpass 3 times, the idea has 18, including is reported the air pollution 8, noise 9, open burning 1. According to the reporting number of times, has possibility and the synthesis examination result the pollution, according to sets up traces either lists as object of continually the secondary tracing, the arrangement reexamination traveling schedule, the accumulation has completed 151 inferior reexamination, the result discovery has not had the pollution or the contrary fact. Third, the fixed source of pollution generality does an inspection Carries on view of the fixed source of pollution checks does an inspection, the idea completes 126 to be next does an inspection, to check the result discovery not to have the contrary situation, this year row tube name list intermediate total counsels 1 automobile Uygur to study at school to install against system equipment, reduces the air pollution, other check do an inspection the public and private place are the request strengthen against system equipment maintenance maintenance. Fourth, the open burning does an inspection the work achievement Controls the place in view of the row tube 15 open burnings, altogether completes key does an inspection 167 times, carries on the generality to do an inspection the idea 79 instances. In the process discovered that 3 open burning situations, suppress promptly by the doing an inspection personnel, reduce the pollution production. Fifth, impeachment case following tracing control achievement By a set time improves case total 41, reports 18 including the air pollution unusual smell, builds project 3, noise 20. Eliminates builds the project to finish 2, to close down business or to migrate 2, and 1 stall keeper lampblack, already completed the reexamination, and supervises to complete the improvement. Sixth, other promotion do an inspection to control the result work 1. in high place observation open burning control achievement Selects this city open burning key region, establishes 9 high places to observe the place. The accumulation completes 89 times, altogether discovered that 2 open burning pollution situation, promptly suppresses the source of pollution. 2. coordinates the SIP execution air quality bad when controls the measure When receives the air quality bad notification, strengthens the execution control measure, execution period total strengthens the execution air pollution to examine 53 times, the result discovery has not had the air pollution situation, the investigation result transmitted according to the stipulation before previous day 10:00 am gives SIP. Seventh, air pollutant decrement achievement Counts open burning improvement case total 53, pushes estimates may reduce the open burning to shoulder 68.7 metric tons, and causes each item of air pollutant to reduce the quantity is: TSP 606.27 kilogram, Sox 3.75 kilogram, NOx 140.99 kilogram, CO 4,706.39 kilogram, THC 849.60 kilogram, NMHC939.14 kilogram.
Keyword
The night air pollution case impeachment case processes
Open
top